Summit going on

Summit going on

For the world leaders summit, we dressed the main meeting room, raising the floor level, cladding the walls and pillars with a vinyl finish and installing a suspended ceiling with downlighters. We also replaced a set of windows with double patio doors and built steel framed limestone steps down to ground level along with authentic looking low level walls and handrails either side; designed to seamlessly match other areas in the hotel.

Project

Foreign and Commonwealth Office

Client

Jack Morton Worldwide

Further Details